Inside the industrial park, 15 min from Mty International Airport.
Minimum height: 8m
Maximum height at the center: 11.5 m
On the main avenue with high vehicle traffic, with transport routes.
Maneuvering yard
Cost per m2: $125
Maintenance cost: $3.00 pesos per m2
Reinforced concrete slab F’c: 250 kg/cm2Dentro de parque industrial, a 15 min Aeropuerto Internacional Mty.
Altura minima: 8mts
Altura maxima al centro: 11.5 mts
Sobre avenida principal de alto flujo vehicular, con rutas de transporte.
Patio de maniobras
Costo x m2: $125
Costo de mantenimiento: $3.00 pesos x m2
Firme de concreto armado F’c: 250 kg/cm2