Height: Minimum 8 Meters, Maximum 10.5 Meters
• Height platform 1.20 m with steel angle. • Ramp and platform with steel curtain. • Roof: Sheet Metal Gauge 24 corrugated R101 Galvalum and Translucent Sheet Estability. • Thermal Insulation on Roof
• Concrete Columns; sides every 7 meters, front and back every 5 meters. • Block walls of 6 (40 x 20 x 15 cm), with closures every 3.57 meters. • Reinforced concrete slabs with mesh 66 10 10, with control joint cuts every 6 Meters.
Concrete floors 15 cm thick with resistance 250 F’c. • Spacious Parking. • 2 Levels of Offices, each 70 m2
• Offices with porcelain tile flooring, paint, equipped with doors and windows. Four interior bathrooms, two exterior bathrooms, and one shut-off valve. • Preparation for Minisplits. • LED lamps outside the offices. • Louvers for ventilation. • Electrical connection 220 Three-phase. Substation of 75 kVas
• Streets 12 Meters wide + 3 meters of Sidewalk.Altura: Mínima 8 Metros, Máxima 10.5 Metros
• Anden de altura 1.20 m con ángulo de acero. • Rampa y Anden con cortina de acero. • Cubierta: Lamina Calibre 24 ondulada R101 Galvalum
y Lamina Traslucida Estability. • Aislante Térmico en Techo
• Columnas de Concreto; laterales cada 7 metros,
frente y fondo cada 5 metros. • Muros de Block del 6 (40 x 20 x 15 cm), con
cerramientos cada 3.57 metros. • Losas de concreto reforzadas con mallalac 66 10 10,
con corte de juntas de control cada 6 Metros.
Pisos de concreto de 15 cm de espesor con resistencia
250 F’c. • Amplio Estacionamiento. • 2 Niveles de Oficinas, cada una de 70 m2
• Oficinas con piso porcelanato, pintura, equipadas con
puertas y ventanas. Cuatro baños interiores, dos baños
exteriores y una llave de paso. • Preparación para Minisplits. • Lámparas Led al exterior de las oficinas. • Louvers para ventilación. • Conexión eléctrica 220 Trifásica. Subestación de 75 kVas
• Calles de 12 Metros de ancho + 3 metros de Banqueta.
T.A.D. Pemex Refineria, Santa Catarina, Nuevo León